Highway, Street, and Bridge Construction in South Dakota: worksite records for vetting

14 worksites in this trade in South Dakota filed with OSHA for 2025. Each row shows the three-year rate computed from the worksite's own filings, its range and the hours behind it. The list is in name order and is not a ranking.

South Dakota

WorksiteThree-year rateRangeHours, three years
A-G-E Corporation, Fort PierreNo three-year rate
Asphalt Surfacing Company, Sioux Falls5.92.5 to 11.6272,536
Bowes Construction, Inc, Brookings4.01.8 to 7.5454,203
BX Civil and Construction, Dell Rapids5.32.9 to 8.9528,819
Commercial Asphalt, Mitchell6.23.0 to 11.3324,109
Highway Improvement, Inc., Sioux FallsNo three-year rate
Morris, Inc., FORT PIERRE4.82.9 to 7.4831,055
Quinn Construction, Inc., Rapid City3.30.7 to 9.7180,114
Reede Construction Inc, Aberdeen3.50.7 to 10.3170,673
SealPros Inc, Harrisburg2.80.3 to 10.2141,199
Sir Lines-A-Lot Harrisburg, Harrisburg8.92.9 to 20.9111,873
Sir Lines-A-Lot Tea, TeaNo three-year rate
T&R Contracting Inc, Sioux Falls4.52.1 to 8.5400,144
Tru-Form Construction, Inc., Summerset25.216.3 to 37.2198,502

Results are ordered by name match, then by name. They are never ordered by rate. A wide range means few hours worked. Read each worksite's own page before you rely on a figure.

Source: OSHA Injury Tracking Application, Form 300A summary data for 2025, file posted 6 October 2026.