Highway, Street, and Bridge Construction in South Carolina: worksite records for vetting
| Worksite | Three-year rate | Range | Hours, three years |
|---|---|---|---|
| Satterfield Construction Company, Greenwood | 0.7 | 0.1 to 2.5 | 580,065 |
| SC Paving, West Columbia | 2.4 | 1.2 to 4.4 | 828,214 |
| SCDOT Carolina Crossroads Ph 2 Broad River Rd at I 20 Interchange, Columbia | 0.0 | 0.0 to 2.8 | 261,143 |
| SCDOT I 26 Widen MM 85 101 Irmo DB, Chapin | 0.4 | 0.0 to 2.1 | 527,909 |
| SCDOT I26I95 Interchange Improve DB, Harleyville | 0.0 | 0.0 to 4.1 | 179,109 |
| South Carolina, West Columbia | No three-year rate | ||
| South Carolina Construction, Greer | 0.4 | 0.1 to 1.1 | 1,543,105 |
| The Sharon Company, Inc., Lexington | No three-year rate | ||
Results are ordered by name match, then by name. They are never ordered by rate. A wide range means few hours worked. Read each worksite's own page before you rely on a figure.
Source: OSHA Injury Tracking Application, Form 300A summary data for 2025, file posted 6 October 2026.