Power and Communication Line and Related Structures Construction in California: worksite records for vetting
| Worksite | Three-year rate | Range | Hours, three years |
|---|---|---|---|
| 105781 - 35.5MW P66 Rodeo CA Solar, Rodeo | 0.0 | 0.0 to 5.1 | 145,553 |
| 106108 - 1884 Line Co - PP PacifiCorp California, Weed | 1.7 | 0.0 to 9.3 | 119,288 |
| 320, Alviso | 9.1 | 4.4 to 16.7 | 219,905 |
| American Tower Corporation - Irvine, Irvine | 0.0 | 0.0 to 4.2 | 175,354 |
| Ample Electric, Inc., Sacramento | 1.1 | 0.0 to 6.1 | 182,318 |
| Arrow Drillers dba Arrow Construction, Sacramento | 0.8 | 0.1 to 3.0 | 482,623 |
| B&J Construction Consulting, Woodlake | No three-year rate | ||
| Basin Enterprises, Inc., Red Bluff | 0.6 | 0.1 to 2.1 | 683,645 |
| BETA Engineering California, LP, San Diego | 0.0 | 0.0 to 5.4 | 136,833 |
| C&C Utility, Inc., Chico | 1.3 | 0.4 to 3.0 | 791,981 |
| CA-Alhambra Combined: SCE 10, Alhambra | 2.5 | 1.7 to 3.4 | 2,836,673 |
| Cal West Underground, Inc., Norco | 2.8 | 0.9 to 6.4 | 363,324 |
| CalCom Energy, Visalia | 0.0 | 0.0 to 4.8 | 155,208 |
| Caster Civil, Inc., El Cajon | 0.0 | 0.0 to 3.9 | 187,887 |
| CIK POWER Distributors LLC, Orange | 1.1 | 0.2 to 3.1 | 572,897 |
| Clark Bros Inc, Fresno | 0.8 | 0.0 to 4.3 | 261,367 |
| Cosntruction, Salinas | 7.9 | 2.9 to 17.2 | 152,000 |
| Diversified Utility Services, Inc., Bakersfield | 1.4 | 0.5 to 3.4 | 696,848 |
| Edison - California, Fairfield | 0.6 | 0.0 to 3.1 | 355,536 |
| EdSan 1C Solar Terra Gen Power 23145012, Mojave | 1.4 | 0.3 to 4.0 | 437,183 |
| EdSan 2A2B Solar 24145012, Mojave | 1.5 | 0.3 to 4.3 | 403,646 |
| Edwards Sanborn 2A 2B Storage 24149015, Mojave | No three-year rate | ||
| Edwards Sanborn Solar Storage TerraGen1A 1B 20145007, Mojave | 1.5 | 0.3 to 4.4 | 402,287 |
| Energy Delivery Partners, Templeton | 0.0 | 0.0 to 2.0 | 367,202 |
| Ferreira Power West, Irvine | 0.3 | 0.0 to 2.0 | 563,563 |
Results are ordered by name match, then by name. They are never ordered by rate. A wide range means few hours worked. Read each worksite's own page before you rely on a figure.
Source: OSHA Injury Tracking Application, Form 300A summary data for 2025, file posted 6 October 2026.